DVT Terminal Modernization
Scope
The Phoenix Deer Valley Airport (DVT) Terminal Modernization project will transform the existing two-level terminal through comprehensive interior and exterior improvements. Planned upgrades include a redesigned entrance, new shade structures, and a reconfigured layout that brings administrative operations together and creates flexible event spaces.
Status
Project is currently in pre-construction phase.
Contractor
J.E. Dunn Construction





