Terminal 4 Terrazzo Flooring

 


Scope

Scope: The Terminal 4 Terrazzo Flooring project has been initiated to replace carpet with terrazzo flooring within the N1, N2, N3, N4, S3 and S4 Concourses along with Level 1 (Baggage Claim) and Level 2 (Ticketing) areas. Each area will be completed in multiple phases to mitigate impacts to airport and tenant operations.

Due to the level of construction activity, the following will be noticeable as work progresses through each area:

  • Restroom Closures
  • Service Elevator Closures
  • Construction Noise

All construction areas will be enclosed with low-level barricades that will allow concession, retail and airline areas to remain operational. Unlike most construction projects, this project will be 100% visible to airport passengers and stakeholders providing the unique opportunity to see all phases of the terrazzo flooring installation process.

PROJECT DETAILS >>


Status

Terrazzo Flooring installation throughout Level 1 (Baggage Claim) began December 2018. Construction will be performed in 14 individual phases and is anticipated to be completed by November 2019. Baggage carousels will be maintained throughout each phase.


Contractor

McCarthy Builders