Terminal 4 Terrazzo Flooring

Scope: The Terminal 4 Terrazzo Flooring project has been initiated to replace
carpet with terrazzo flooring within the N1, N2, N3, N4, S3 and S4 Concourses
along with Level 1 (Baggage Claim) and Level 2 (Ticketing) areas. Each area will be completed in multiple phases to mitigate impacts to airport and tenant operations. 

Due to the level of construction activity, the following will be noticeable as work progresses through each area:

  • Restroom Closures
  • Service Elevator Closures
  • Construction Noise

  • All construction areas will be enclosed with low-level barricades that will allow concession, retail and airline areas to remain operational.  Unlike
    most construction projects, this project will be 100% visible to airport
    passengers and stakeholders providing the unique opportunity to see all
    phases of the terrazzo flooring installation process.

    Click here for more details


    Status: Terrazzo installation in the N4 Concourse (Gates B15-B28)
    is progressing on scheduled and is anticipated to be
    completed in early September 2017.

    Terrazzo flooring installation is scheduled to begin within the
    S3 Concourse (Gates C1-C9) on April 5, 2017 with carpet removal.
    Normal construction work hours are 10:00 PM until 6:00 AM
    (Sunday thru Thursday). Each area will be completed in multiple
    phases to mitigate impacts to airport and tenant operations.


    Contractor: McCarthy